Terms & Conditions

    1. This estimate is valid for thirty (30) days from the date of issuance
    2. Unless arrangements are made prior to loading, all transport charges are to be paid via wire transfer upon delivery.
      If credit is awarded, payment is due within 30 days of the date of invoice and all charges are subject to a one half percent (.005) per day late fee.
    3. The estimate is based upon the dimensions and weights provided by the customer.
    4. The shipper and consignee are responsible for providing a clear and direct access to and from the job site.
    5. The shipper and consignee are to assist in the assembly and disassembly of all equipment when needed.
    6. This estimate may not include charges for city and county permits or costs associated with the requirement imposed by local officials.
    7. This estimate is contingent upon securing permits from all proper governing agencies.
    8. It is the responsibility of the shipper, contractor, or consignee to post any bond required for this move on any city, county or state highway.
      This cost is not included in this estimate.
    9. The underlying carrier has primary responsibility for cargo claims. Please be aware of common conditions as shown below:
      • On new commodities underlying carriers’ cargo liability may be limited to $2.50 per pound or a maximum of $250,000.00 per shipment or less.
      • On used commodities underlying carriers’ cargo liability may be limited to upset damage only in the total amount of $5,000.00 or less.
      • If excess amount is required the underlying carrier must be notified in writing prior to loading and the excess amount charges for additional cargo insurance coverage must be agreed upon in writing, in advance of scheduling the shipment.
      • The declared amount for the underlying carrier must be stated upon the bill of lading to assure full cargo protection from them.
    10. This estimated does not include the loading of cargo onto equipment at origin, or the unloading of cargo at destination.
    11. The shipper will be required to supply blocking and bracing for each shipment.
    12. This quote reflects an estimate based upon the center of gravity of the piece being evenly distributed, if not the customer must provide a drawing to reflect the actual center of gravity for trailer and deck adjustments.
    13. This estimate includes one (1) feasibility route survey. Any additional surveys, if required, will be billed at cost plus 20%.
    14. This estimate does not include engineering or bridge study fees. If required, these fees will be billed at cost plus 20%.
    15. Depending upon the size and weight of the shipment, please allow a minimum of 30 days advance notice to organize equipment and secure the necessary permits. Some state require a minimum of 6 to 8 weeks to issue a permit.
    16. The shipper will be required to provide documentation for support letters when needed and we will provide assistance.
    17. This estimate does not include utilities, bucket trucks, or movement of obstructions. If required, these fees will be billed at cost plus 20%.
    18. This estimate doses not include fees associated with Railroad Crossing Right-of-Ways.
      (Example – Flagmen) if required, these fees will be billed at cost plus 20%.
    19. This quote is based upon loading and unloading during normal business hours. In order to accommodate loading or unloading that requires weekend layover or circumstantial hours of operation, additional charges will need to be assessed.
    20. Trucking company allows for (3) three hours of free time for loading and unloading of their equipment.
      • Once free time has elapsed, detention will be assessed on a per hour basis and is tiered based upon the type of equipment used to transport the commodity.
      • Upon acceptance of this quote, detention will need to be defined with the trucking companies personnel.
      • Any Additional charges or delays due to inclement weather conditions are not the responsibility of Dover Services, Inc.
      • DETENTION DEFINED; ONCE FREE TIME HAS ELAPSED THEN DETENTION WILL NEED TO BE ASSESSED AT THE RATE OF:
        • SUPER DUAL LANE $850.00 PER HOUR WITH A MAXIMUM OF $8,500.00 PER DAY.
        • DUAL LANE $600.00 PER HOUR WITH A MAXIMUM OF $6,000.00 PER DAY.
        • AXLE RIGS: $450 PER HOUR WITH A MAXIMUM OF $4,500.00 PER DAY
        • AXLE RIGS: $250 PER HOUR WITH A MAXIMUM OF $2,500 PER DAY.
        • AXLE RIGS: $300 PER HOUR WITH A MAXIMUM OF $3,000.00 PER DAY
        • AXLE RIGS: $200 PER HOUR WITH A MAXIMUM OF $2,000.00 PER DAY.
        • AXLE RIGS: $100 PER HOUR WITH A MAXIMUM OF $1,000.00 PER DAY
    21. Carrier / Broker will do their best to meet scheduled loading times and assumes no responsibility for delay in arriving to load.
    22. All matters involving shipments tendered to Dover Services, Inc. shall be construed, performed, and enforced exclusively under the laws of the State of Michigan, USA, without regard to the choice of law or conflicts of laws rules. Customers irrevocably agree and consent that any action against Customer may be brought in any state or federal court that has subject-matter jurisdiction and is in, or whose district includes, Wayne County, Michigan, and that any such court shall have personal jurisdiction over Customer for purposes of such action.